Keban/Hirfanlı HEPP Control Systems Development

Share this News

TEİAŞ (2022-2027)

  • Development of Power Plant Control Systems
  • Network Quality
  • National Design
  • Current Technology
  • Technology Transfer Preparation
  • Target of 1440 MW Installed Capacity for Keban HEPP
  • Renewed Speed Regulator
  • THS 6-9

For questions and suggestionsContact Us

Most Recent