Design and Production of Sarıyar HEPP Components

Share this News

EÜAŞ (2020-2026)

  • 40 MW Hydro Turbine Design and Manufacturing
  • High Performance
  • Low Cost
  • Domestic Design of 4×40 MW Components
  • THS 4-6

For questions and suggestionsContact Us

Most Recent