TUBU̇TAK 1004 (2021-2025)
- 1500V PV Applications
- 125 KW Array Inverter Prototype
- %99 Çıkış Verimi
- 1.5 kW/kg Power Density
- THS-6

TUBU̇TAK 1004 (2021-2025)

The results of the interviews held between 07/05/2025 - 16/06/2025 for the job postings of TÜBİTAK Marmara Research Center (MAM) TBTK.MAM.2025-01 and TBTK.MAM.2025-02...

Strategic projects carried out in cooperation with TÜBİTAK, the Presidency of Defense Industries (SSB) and the leading stakeholders of the sector, are the first of its kind in Turkey's defense, CBRN (Chemical, Biological,...

The results of the interviews held between 23-27/10/2025 for the job announcement of TÜBİTAK Marmara Research Center (MAM) TBTK.MAM.ADAY.2025-1 have been announced. TUBITAK Marmara...

The second phase of the ATHOM project, developed by TÜBİTAK MAM to manage Turkey's largest water basins, concluded with a comprehensive training program for DSİ personnel and dam operators, attended by over 200 participants.